What Home Renovation Savings pays for solar and batteries in Barrie
We re-read the program's solar page and its October 2025 requirements on October 3, 2026. The rebate comes with conditions that change how the system is designed, so read them before you ask for quotes.
Solar panels
Paid on installed DC capacity, capped at 50% of eligible costs. Rooftop systems only, including a garage roof on the same meter.
Battery storage
Only with a new solar system, also capped at 50% of eligible costs. Combined solar and battery rebates reach $10,000.
No net metering
A system under an Ontario net metering agreement is not eligible. The system must be sized for load displacement only.
Approvals before you buy
The contractor files the pre-installation application with a quote dated within 60 days. You cannot buy or install before IESO pre-approval and your local utility's approval.
Finish within 12 months
The project must be complete within 12 months of approval, with the ESA certificate and the connection agreement filed within 30 days of installation.
First-time installs only
Homes that already have solar or storage are not eligible. Leases, rentals and lease-to-own arrangements are excluded.
Canada’s new heat pump rebate is worth up to $10,000. Get an email the day it opens
Planning a heat pump too? This one is on top of the rebates above, and we’ll email you the day it opens.
- Up to $10,000
- if your household earns below the median income
- $2,000
- for other homeowners who qualify
Stack it with the Ontario rebate open today
Ottawa says you can combine them. Each program has its own rules. Amounts are the most you can get.
Applications open early 2027
Join the launch alert
- Launch-day email, with what to do first
- Who qualifies for the $10,000, once Ottawa says
- A short hello now, so you know it worked
Know someone with old heating? Send them this.
Only emails about this rebate. No spam, no sales calls. Unsubscribe anytime.
Read everything we know so far Official page: canada.ca
The requirements document gives no end date for this stream, and funding conditions can change, so confirm on the program page before you sign. The IESO has no pre-qualified contractor list for it.
Barrie Hydro and the connection
Barrie Hydro is the local distribution company. It approves the connection before you buy, and the post-installation file needs its connection agreement and the ESA certificate. Ask what size it allows and how long its review takes, since the project must be finished within 12 months of approval.
Snow and roofs
Barrie's record low was -30.3°C. Panels shed snow better at steeper pitches, and the program does not set a minimum pitch. Ask the installer how winter output was estimated and whether the mounting meets local snow-load requirements.
Housing
58% of Barrie households live in detached houses, and 68% own. About 10% live in homes built since 2011. 12% live in low-rise apartments and 3,555 in duplexes, which are not eligible house types.
Why net metering matters here
Many Ontario solar quotes assume net metering, where extra power sent to the grid earns bill credits. This program does not allow it: a system under a net metering agreement is not eligible, and the system must be sized for load displacement, meaning it should match what the home uses. A Barrie owner who wants the rebate should tell every installer up front, because a system designed to export will not qualify.
What counts as a cost
The rebate is capped at 50% of eligible costs, which cover equipment, permits, approvals and labour. HST, financing costs, insurance, maintenance and spare parts are not eligible costs. A quote should therefore show the pre-HST price and separate any financing, so the program can check that $1,000 per kW does not exceed half.
Timing of the project
The order matters. The contractor submits the pre-installation application with a quote dated within 60 days, you receive written pre-approval and your utility's approval, and only then do you buy and install. The system must be finished within 12 months of approval, and the contractor files the post-installation application within 30 days of installation.
Owners only
You must own the home and be the person paying for the system. A tenant cannot apply for the owner. In Barrie, 32% of households rent, and only eligible house types qualify: single detached, semi-detached, row, townhome or mobile home on a permanent foundation.
How to claim in Barrie
- Confirm you own an eligible house type with a roof or garage that suits panels.
- Talk to Barrie Hydro about the connection process and the maximum system size allowed before you sign anything.
- Choose a licensed electrical contractor and ask for a quote that shows the DC capacity in kW and the eligible costs without HST.
- Let the contractor file the pre-installation application, and wait for written IESO pre-approval and utility approval before buying or installing.
- After the install, check that the post-installation application is filed within 30 days with the ESA certificate and connection agreement.
Common questions
Who approves the connection?
Barrie Hydro.
Does winter affect the rebate?
No, but it affects output.
Do duplexes qualify?
No.
How long do I have to finish?
12 months from approval.
What to do next
See Barrie insulation rebates, heat pump rebates and the Ontario rebate calculator.
By Sam Menard. Sources, last read October 3, 2026: Home Renovation Savings: solar and battery, Solar and Storage stream requirements (PDF), Save on Energy: Home Renovation Savings, Statistics Canada 2021 Census, table 98-10-0233-01. All Barrie rebates → Every Home Renovation Savings rebate →


